Friday, October 13, 2006

Procrastination

This is the rework of the previously mentioned Dale-in-progress. I ripped back to the top of the ribbing, added the row of 3x1 ribbing to encourage the transition to be a little more smooth and then proceeded onwards. I've given no hint of scale, but the ribbing was about 3 inches deep. I had about 2 or 3 more inches of knitting done originally, and as usual, the sight of knitting going in reverse is deeply painful to J. I assured him that I don't think this bit will be done in reverse again.

I am, however, procrastinating on recalculating the raglan seam lines. I realized when I was looking at the schematic that while the overall measurements of this sweater as designed are the same as the sweater I'm supposed to be replacing, the underarm cuts 3 inches higher. Somehow I don't think that this is going to be acceptable. He likes the way the old sweater fits and I am pledged to try to reproduce it. (In new warmer yarn and with a different but equally subdued pattern across the chest, of course. And the addition of a short zipper at the neck, which he thought was a cool idea but not cool enough to go to a drop shoulder model. ) This means I'm going to have to recalculate the raglan seam decreases. Well, maybe not today. After all I don't need those calculations until the acres of stockinette on the body (and the bottom part of the patterned bit on the body) and two sleeves are done. Why I've got loads of time.

And in the meantime, we can admire what's left of the bit of snow that dropped last night. The lone remaining sunflower looks sort of ok from a distance, but it has that fragile ragged look about it that I think means "frost damage". I haven't dared to look at the mums and the zinnias in the front yard since the sun hit them this morning.

No comments: